Loading...
HomeMy WebLinkAbout012-740-36-2201-LUP-2020-182 `�;� ,..,..�� , �. 6/2/2020 CONTRACTOR'S ESTIMATE SHEET Location Bi Musk Bar �ot Block Trect Owner Bi Musk Resort,LLC Address Phone Architect Address Phone Description Size Estimaled b ARCHITECTURAL HEATING Plans 8 S ecs $3,500 Gas/Elect $11,800 En ineerin $ Misc. $ PRELIMINARY $MILL WORK $ Surve $ Frames � Wreckin $ Interior Finish $ LEGAL $ Sash $ � Bld ermit $500 Doors $ WaterTa $2,500 Screens $ Street De osit $ Cabinets $ ConstruCtion Water $3,000 Slair Work g EXCAVATING $ Ironin Boards § Excavate remove trees and dis ose $1,800 Misc. $ � Y Gradin 8 Fillin di ,backfill,com act footin s $2,900 GLAZING $ � Haulin sand lift 300 ards $2,600 Misc.Glass $ Gravel $3,000 Plate Glass $ � CONCRETE $ Mirrors $ n . Walls,etc. ds. $10,000 Weather Stri s g �v Reinforcin Steel $TILE g \ Concrete Block $ Ceramic Tile Work $ v� Walks,etc. S .Ft. $5,000 Misc. $ Floors S .Ft. $10,000 PAINTING 8 DECORATING $ � Ste s Lin.FL $ Paint Material INT&EXT $7,500 Li ht wei ht S .Ft. $ Paint Labor $ Metal Pans $ Wall Pa er 8 Labor $ MASONRY $ S ecial Decoratin $ Common Brick M $ Water roofin $ Hollow Tile M $FLOORS $ Concrete Block $ Hardwood 3 Chimne 5 8 Fire lace $ Linoleum $14,000 Mantels $ Com osition $ Stone Work $SWIMMING POOL $ Face Work M S Heater $ LUMBER S Extras $ Rou h M $70,000 APPLIANCES $ Finish M $ Stoves Gas or Elect $ CARPENTRY $ Ovens Gas or Elect $ Rou h Sidin $22,350 Hoods $ Finish Interiorwood $10,000 Garba e Dis osal $ SANITATION $ Dishwasher $ Plumbin Nor Pines $15,000 Vacuum S stem $ Borin ,di in -Butte�eld $9,000 Cooler $14,399 Plumbin materials $15,000 Misc. $ INSULATION $FIRE PREVENTION ^� Installin Labor 8 Materials $15,800 Fire S rinklers $ Materials $ Fire Extin uishers $ $ELEVATOR $ $MISCELLANEOUS $ ROOF $ Window shades $ . Com osition labor onl $2,000 Awnin s $ Tile $ Refri eration 8 Reezers Trusses $ Insulation 8 Sound roofin � Misc. $ Cleanin Windows,etc. $ LATH 8 PLASTER $ Removin Debris $ Exterior ds. $LANDSCAPING 5 Interior ds. $ Lawn 8landsca in $5,000 Staff Work $ Shrubbe $ Dr Wall $ S rinklers stem $ Misc. $ Fence $ CEILING $INSURANCE $ Accoustic $ Com ensation � HARDWARE miscellaneous $2,500 Liabilit $ Rou h $ Fire $ Finish $ Bond $ Misc. $EXTRAS $ ELECTRICAL $ $ Wirin ElectAllowance $29,000 overe es $30,000 Fixtures $ $ Jum River Elec $4,600 $ AIR-CONDITIONING included in heatin bid $ $ Ducts $TOTAL COST 5322,749 E ui ment $ PROFIT $ Misc. $COMPLETE BID $ Szaa,oso J-R Excavating PO Box 13137 Hayward, WI 54843 Phone # 7155585955 jermurdock@hotmaii.com 4/14/2020 84 Shannon Uttech 11122 W Co Road B Hayward, WI 54843 Description Qty Rate Total Big Musky- New Bar Tree removal and disposal 1 1 ,800.00 1 ,800.00 Sand for lift (300 yds) 1 2,600.00 2,600.00 Dig and backfill footings 1 2,000.00 2,000.00 Gravel $16.66 per yard Unknown 0.00 0.00 Compaction of footings & site 1 900.00 900.00 $7,300.00